Professional/Teaching Experience
Professional Experience
SELECTED PROJECTS DESIGNED AND SUPERVISED AS TEAM LEADER, PROJECT MANAGER, QUANTITY SURVEYOR, CIVIL OR STRUCTURAL ENGINEER
Construction of proposed 4-storey Shopping, Residential and Office Block for Dr Frimpong Manso Addo at Nkawkaw. 2024.
Civil (Structural) Engineer of the project.
Completion of 4-storey SHS Classroom Block for the Ridge School, 1966, Kumasi. 2023-2024
Responsible for all Quantity Surveying duties.
Proposed 2-storey Residential Building with 2-bedroom Outhouse with associated Extental works at Daban Patuda for Mrs Beatrice Enin. 2023.
Responsible for all Quantity Surveying duties.
Proposed Renovation of the Postgraduate Classroom and Staff Common Room and the Construction of new Workshop and Staff Offices for the Department of Construction Technology and Management, KNUST (2020).
Structural Engineer of the project.
Proposed 2- Storey Pre-School Classroom Block for the Ridge School, 1966, Kumasi. 2019
Quantity Surveyor responsible for the preparation of Bills of Quantities, Cost Estimates etc.
Construction of proposed 6-storey Shopping Mall and Office Block for Dandycyn Limited at Menhyia, Kumasi. 2014 – 2019.
Project Manager, Civil (Structural) Engineer and Quantity Surveyor for the project.
Proposed Hostel Block (Ground Floor) for Scripture Union, Ghana at Sekyeredumase – Ashanti 2018 - Date Quantity Surveyor in charge of Measurement of Works and Preparation of Valuations.
Proposed 4-storey SHS Classroom Block for the Ridge School, 1966, Kumasi. 2015 – Date
Responsible for all Quantity Surveying duties.
Proposed 3-storey Residential Building for Christ Apostolic Church International, Bantama, Kumasi. 2013 - 2014
Quantity Surveyor responsible for the preparation of Bills of Quantities, Cost Estimates etc.
Construction of proposed 3-storey Office Block for Grace Baptist Church, Amakom - Kumasi. 2014 – 2015.
Civil (Structural) Engineer for the Pre and Post Contract Stages of the project.
Construction of proposed 6 - Storey Classroom/Office Block for Ghana Baptist University College at Amakom, Kumasi.
Structural Engineer and Quantity Surveyor for the Project.
Proposed Church Building for Christ Apostolic Church, Edwenase – Kumasi 2013 – 2014
Prepared Bills of Quantities, Structural Designs and Drawings for the project.
Construction of 2No. 5,000 m2 Warehouses and their Ancillary Works for Hippo Limited at Tema, 2011 - 2013
Project Manager and Quantity Surveyor. Duties included the preparation of Bills of Quantities, Tender Documents and Tender Reports at the Pre Contract Stage. At the Post Contract Stage, duties included Measurement of Works, Preparation of Interim Certificates and Coordination of activities of all Consultants on the project.
4 Storey Nursing Block for Ghana Baptist University College, Abuakwa – Kumasi 2011 – Date
As the Structural Engineer, my duties included the design of Structural Elements and supervision of Construction Works.
Construction of International Community School (ICS) at Pakyi No. 2, Kumasi. (Phases 1, 2 and 3). Works comprised of Classroom, Laboratory and Administrative Blocks, Libraries, Hostels, Playing Field, Sewage System, External Works, Internal Road Systems, Culverts, Water Tanks etc. 2002 - 2014
As the Civil Engineer, my duties included the Design of Reinforced Concrete Structural Elements and Civil Works and the Supervision of the works. As the Project Quantity Surveyor, they comprised the preparation of Bills of Quantities, Cost Estimates etc. and as the Project Manager, duties included the coordination of the activities of other Project Consultants and submission of monthly progress reports to the Financiers in Washington, USA.
Construction of Integrated Rural Arts and Industry/Cultural Studies Building (Continuation Project), Kwame Nkrumah University of Science and Technology. 2009 – 2013
Quantity Surveyor in charge of measurement of construction works and Preparation of Valuations and Valuation of Variations.
KNUST Dental School for College of Health Sciences at Komfo Anokye Teaching Hospital, Kumasi 2009 – 2010
Quantity Surveyor in charge of measurement of construction works, Preparation of Valuations, Valuation of Variations and Preparation of Final Account.
Construction of 4 Storey ENIKO Students Hostel at KNUST, Kumasi, 2008 – 2013 Responsibilities included Reinforced Concrete Design of the facility, Preparation of Bills of Quantities, Measurement of Construction Works, Preparation of Interim Certificates, Cost Analysis and Control of the Project, Valuation of Variations and Preparation of Progress Reports for the Client.
Construction of 3 Storey Residential House, New Amakom, Kumasi for Madam Veronica Senah. 2008
Responsibilities included Preparation of Bills of Quantities, Measurement of Construction
Works and Preparation of Interim Certificates, Cost Analysis and Control of Project,
Valuation of Variations and Preparation of Progress Reports for the Client.
Refurbishment of 3 No. Senior Staff Bungalows at KNUST, Kumasi. 2007 - 2008
Responsibilities included Measurement of Construction Works and Preparation of Valuations, Cost Analysis and Cost Control of the Project, Valuation of Variations and Preparation of Final Account.
Refurbishment of the Main Administration Block of Guinness Ghana Breweries Limited at Kaasi, Kumasi. 2007 – 2008. Quantity Surveyor in charge of Measurement of Construction Works and Preparation of Valuations, Valuation of Variations and Preparation of Final Account.
Construction and Completion of Multi-Purpose Complex for Messrs Fredco Limited at Kejetia, Lorry Terminal, Kumasi. 2007 - 2008
Project Quantity Surveyor in charge of Measurement of Works and Preparation of Valuations etc.
Expansion of Church Auditorium for Grace Baptist Church at Amakom, Kumasi 2005 – 2007
Design of Structural Elements and Supervision of Construction Works
Refurbishment of Refurbishment of 2 Storey Guest House and Outhouse at Patasi, Kumasi for First Allied Savings and Loans Company Limited, 2007 – 2008. Responsibilities included Reinforced Concrete Design of the facility, Preparation of Bills of Quantities, Measurement of Construction Works and Preparation of Interim Certificates, Cost Planning and Cost Control of the Project, Valuation of Variations and Preparation of Final Account.
Construction of Chemical Stores for Guinness Ghana Breweries Limited, Kaasi, Kumasi. 2007
Responsibilities included Measurement of Construction Works, Preparation of Valuations, Cost Planning and Cost Appraisal of the Project, Valuation of Variations, and Preparation of the Final Account.
Construction of Oil Storage Facility for Guinness Ghana Breweries Limited at Kaasi, Kumasi, 2007. Responsibilities included Measurement of Construction Works, Preparation of Valuations, Cost Planning and Cost Appraisal of the Project, Valuation of Variations, and Preparation of the Final Account.
Refurbishment of Main Administration Block of Guinness Ghana Breweries Limited at Kaasi, Kumasi. 2006
Responsibilities included Measurement of Construction Works, Preparation of Valuations, Cost Planning and Cost Appraisal of the Project, Valuation of Variations, and Preparation of the Final Account.
Proposed Hotel for Calwall Limited, Switchback Road Residential Area, Accra. 2006
I was the Structural Engineer responsible for the design of Structural Members and Preparation of Structural drawings.
Refurbishment of 3 - Storey House of Excellence Office Complex at the Central Business District of Adum, Kumasi, 2005 – 2006. Project Manager for the Project.
Construction of a Church Auditorium for Sakumono Evangelical Presbyterian Church, Sakumono, Accra. 2002 – 2005
Design of Structural Elements and Preparation of Structural Drawings.
Construction of a Church Auditorium for Trinity Baptist Church, Patasi, Kumasi. 2002 – 2005
Design of Structural Elements, Preparation of Structural Drawings and Supervision of works.
Construction of Global Evangelical Mission Hospital, Apromase, Kumasi, 2002 – 2003.
Civil (Structural) Engineer for the Project, I was responsible for the design of all the Structural Elements and the preparation of the Engineering drawings of the hospital.
Studies, Design and Construction Supervision of 42.20 km of Feeder Farm Roads in the Adansi West and East Districts of the Ashanti Region, 2002 - 2003
Duties included Desk Studies, Reconnaissance Surveys, Data Collection, Detailed Engineering Design of Roads, Preparation of Cost Estimates, Tender Documents and Inception Reports.
Construction of a 6 Unit Classroom Block at Amankwatia School, Kumasi and Community Library for AME Zion School at Asafo, Kumasi for Social Investment Fund (GPRP), 2002
Responsibilities included measurement of Construction Works and Preparation of Valuations, Cost Analysis and Cost Control of the Project, Valuation of Variations etc.
Construction of 2-Storey Library Block for Ghana Baptist Seminary, Abuakwa – Kumasi. 2002– 2003
As the Structural Engineer, my duties included the design of Structural Elements and supervision of Construction Works.
Construction of a 4-Storey Classroom Block for New Tafo Baptist Church, New Tafo, Kumasi. 1999 – 2003
As the Civil Engineer in charge of the project, I provided all Pre and Post Contract Engineering Services.
Construction of Student Hostels for Ghana Hostels Company Limited of Social Security and National Insurance Trust (SSNIT) at KNUST, Kumasi. Works included the construction of 4No. 3-Storey Hostel Blocks together with associated Civil Works such as Roads, Sewage Systems, External Works etc. 1999 - 2001
As the Resident Engineer in charge of the project, my responsibilities included the Revision of designs and Supervision of construction activities of 4 Contractors and the Preparation of revised drawings.
Construction of a 3-storey Classroom Block for Kumasi Polytechnic, 1999 - 2000 Structural Engineer in charge of the design of Structural Elements and supervision of construction works.
Construction of a 4-storey School Block for Grace Baptist Church, Amakom – Kumasi. 1999 - 2001
Design of Structural Elements and Supervision of Construction Works.
Resource Person for the Training of all District Chief Executives and Members of the various District Tender Boards in the Volta Region (1999). Responsibilities included the Development of a Curriculum for the training of the District Assemblies, preparation of the Training Manual, delivery of Lectures and submission of final report to sponsors.
Quantity Surveyor on the Team of Consultants appointed by the Government of Ghana to document all ongoing Central Government Funded Projects in the Volta Region of Ghana. The team inspected over 300 Projects made up of Feeder Roads, Highways, Bridges, Schools, Hospitals, Irrigation Dams, Water Works, Rural Electrification, Border Posts, Sea Defence Works, etc. 1998
Duties included the inspection of all existing projects funded by the Government, assessment of work done and all outstanding works, reviewing the justification of each project, provision of estimates of outstanding works for each of the projects and preparation of a report for the Government of Ghana.
Studies, Design and Construction Supervision of 214.20 km of Feeder Farm Roads in the Western Region of Ghana (STABEX 96) 1996 - 1998
Preparation of Cost Estimates, Measurement of Construction Works and Preparation of Interim Certificates, Cost Planning and Cost Control of Project, Valuation of Variations and Preparation of Final Account.
Construction of 1500 Capacity Star of David Presbyterian Church, Bohyen – Kumasi, 1997 – 2024. Project Manager and Civil Engineer for the Project.
Construction of 6 Storey Reinforced Concrete Framed Stores and Offices Block (Agyekum House) at Adum, the Central Business District of Kumasi for Agyekum & Sons, 1996 – 1998.
Responsibilities included the design of Structural Elements, preparation of Structural Drawings and supervision of Works.
Construction of Proposed Assembly Hall Complex for Dormaa Secondary School, 1998
As the Engineer, I provided all Pre Contract Engineering Services for the project.
Construction of 2 No Office Blocks and Conference Halls for Ghana Water and Sewerage Corporation at Kumasi and Cape Coast, 1996 -1997 Engineer responsible for Design of Structural Elements and Preparation of Structural Drawings.
Construction of 2 No. Church Auditoriums for Atonsu and Ayigya Evangelical Presbyterian Churches of Ghana, Kumasi, 1996 – 1998 Structural Engineer in charge of the Design of Structural Elements, preparation of Structural Drawings and Supervision of Works.
Construction of Civil Works in Tertiary Institutions in Ghana (Zone 2). World Bank/IDA Funded Project at Kwame Nkrumah University of Science and Technology and Kumasi Polytechnic. At KNUST, the Project consisted of the Completion of the 5-storey Library Extension Block, the Rehabilitation and Extension of the Students' Hostel Sanitation Block at Independence Hall, the Construction of Biological Science Blocks (4 No), the Construction of Non-Residential Student Facility and the Rehabilitation of the 4 Storey Chemistry Block. At the Kumasi Polytechnic, the work included the Construction of the 3 Storey Catering Block and the Rehabilitation of 1 No. Workshop Block, 2 No. Classroom Blocks and the Construction of Non-Residential Student Facility. 1993 - 1997
As the Civil Engineer at the Pre Contract Stage, the following tasks were performed under the direct supervision of the Project Director: Writing of Inception Report, Design Calculations and Preparation of Structural Drawings, Coordination of the activities of the various Project Consultants, Preparation of Tender Documents and Writing of Tender Reports, Revision of Engineering designs.
As the Resident Engineer at the Post Contract Stage, my duties included Supervision of Construction activities at various sites, Writing site minutes and issuing site instructions, Preparation of revised drawings and Writing Progress Reports for the Client.
Construction of a 3-storey Classroom Block for Joy Baptist Church, Santasi, Kumasi. 1995 – 2003 Design of Structural Elements, Preparation of Structural Drawings and Supervision of Works.
Construction of a 3-storey Classroom Block for Believers Baptist Temple, Suame Kumasi. 1995 - 2003
Design of Structural Elements, Preparation of Structural Drawings and Supervision of Works.
Construction of 3 Storey J.S.S. Block, 1000 Capacity Church Building and a 3-storey Reinforced Concrete Framed Guest Flat for Livingspring Baptist Church, Santasi–Kumasi. 1995. Responsible for the design of reinforced concrete elements and preparation of Structural Drawings.
Construction of the proposed Offices for Ghana Medical Association, (GMA), Accra. 1994
Engineering design of facilities and preparation of structural drawings.
Construction of a 300,000 Gallons R.C. Water Reservoir for Guinness Ghana Limited, Kumasi. 1993 Supervision of Construction Works.
Rehabilitation and Extension of the Regional Offices of the Electricity Corporation of Ghana, Kumasi. 1990 – 1992.
Duties under the project included Supervision of Works and Revision of Structural Designs
Construction of 3 No. Women Farmers Demonstration Homes for International Fund for Agricultural Development (IFAD) at Salaga, Ejura & Sunyani. 1992 - 1993
Civil Engineer in charge of the projects
Construction of Training School, Catering and Recreation Facilities at Tema for the Electricity Corporation of Ghana (ECG). 1990
Design of facilities and Preparation of Structural Drawings under the supervision of the Consulting Engineer.
Construction of 3-storey JSS Classroom Block for Grace Baptist School, Amakom – Kumasi. 1990 - 1991
Supervision of Construction Works.